Project Timeline
September 7-13
· Project timeline DUE (September 9th)
· Collect literature on social networking sites
September 14-20
· Paper proposal DUE (September 16th)
· Continue to collect literature
· Map out/outline literature review
September 21-27
· All literature collected by the end of the week!
· Continue working on literature review -- Should be in the writing stage by this point
· Begin working on coding system
· Finalize sample
September 28-October 4
· Begin data collection
· Write up methods section
· Review and revise literature review
· Complete literature review by OCTOBER 4TH
October 5-11
· Continue data collection
· Literature Review Due (October 7th)
· FINISH METHODS SECTION by OCTOBER 11TH
October 12-18
· Methods section DUE (October 14th)
· Continue data collection
· All data should be collected by OCTOBER 18TH
October 19-October 25
· Analyze and code data
· Begin writing results section
· Data collection DUE (5 p.m., October 23rd)
October 26-November 1
· Analyze and code data
· Continue writing results section
· Begin discussion section
November 2-November 8
· Analyze and code data
· Continue writing results & discussion
November 9-November 15
· Results & discussion section done by NOVEMBER 15TH
· Review and revise results and discussion
November 16-22
· Contributions/limitations due (November 18th)
· Read, review and revise paper
November 23-November 29
· Read, review, revise paper
November 30-December 6
· Rough draft of paper due (5 p.m., December 4th)
December 7-December 11
· Incorporate group suggestions
· Read, review, revise paper
· FINAL DRAFT DUE ON DEC. 11TH @ 5 P.M.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment